JobBOSS | Ideas

Show/commit the actual material revision used for a particular job

If a material undergoes a revision change, the new revision is reflected across all the jobs the material appears in.This shouldn't be the case and the material revision that was used for the particular job should be shown, not the latest revision. 

  • Tony Wynohrad
  • Mar 25 2017
  • Future Consideration