JobBOSS | Ideas

PO Receiving: Material cert attached to the received material to be traceble through all phases of the manufacturing process

It would be great if in "PO Receiving" the material cert attached to the received material could be presented in the "Job entry" when the same material is picked.

  • Vanko Dimitrov
  • Sep 29 2023
  • Future Consideration
  • Attach files