JobBOSS | Ideas

Display material revisions in Job Materials

When creating an assembly of manufactured parts, it would be helpful to have the revision displayed. This would be extremely helpful for past assemblies that are revision specific, and would allow for historical data to be compiled of the life span of a material. 

  • Nick Lindsay
  • Oct 8 2018
  • Future Consideration
  • Attach files
  • Nick Lindsay commented
    October 22, 2018 19:28

    Garth,

       Display the revision on the materials tab of an assembly job. As we have to use it as a Bill of Materials, it is imperative that we are able to properly and accurately track rev changes. This is impossible in the current design. Once a revision has been updated in the material master, there is no history of where that revision was used. 

  • Garth Torgeson commented
    October 17, 2018 21:06

    Display the revision where? Build the parts to inventory, and pick those items to the main assembly. This way you can maintain total traceability with the LOT being the job number.