Batch "Operation Start" log into multiple jobs at once
Signing into more Operations
Add Pictures to the individual Job Routing Operations/Work Centers
The ability in ShopBOSS to move multiple parts at the same time.
Create "record locking" so two people can't work on the routing tab at the same time.
Add the Scheduled Start and Stop dates to routing lines in Job Entry Module
Allow for priority code per routing line of job
have more than 2 periods open at once in jobboss accounting
Add multiple lines to pack list for the same job
Ability to pick material to multiple jobs