This idea has been merged into another idea. To comment or vote on this idea, please visit JBCORE-I-2 Change status of multiple lines simultaneously.
We have jobs that are due in the future. At the scheduled time to release the job we will delete all the routing and material lines and copy the routing and material from our Master Quote for that part number. That way we have the most current routing and material for the actual production. Currently we have to delete each individual line of routing and material and this is very time consuming. We only maintain changes for a part number in its Master Quote.
Delete multiple routing lines in Job Entry and Quote Entry
Merged