JobBOSS | Ideas

 

Merged idea

This idea has been merged into another idea. To comment or vote on this idea, please visit JBCORE-I-2 Change status of multiple lines simultaneously.

Ability to select multiple lines in routing or materials then delete the routing or materials in the Job or Quotes Merged

We have jobs that are due in the future. At the scheduled time to release the job we will delete all the routing and material lines and copy the routing and material from our Master Quote for that part number. That way we have the most current routing and material for the actual production. Currently we have to delete each individual line of routing and material and this is very time consuming. We only maintain changes for a part number in its Master Quote.

  • Andy Knebel
  • Oct 17 2019
  • Likely to implement