1. It would be nice to be able to edit the percent complete of an operation from the Job Entry/Routing screen. Right now as far as I can tell the only way to change the % complete is for our foremen to assign an operation to an employee first. It'd be much simpler to run down through the operations in Job Entry and update the % completes all at once. If you could add a % complete box to the Routing screen we could do so. Is it possible to allow % complete to change as the shop puts time on the routing line via Workstation Driver?
What other customers have done to address this in the past is use Workstation Driver to create an elapsed time entry for .01 hrs, with a % complete.
Are you using ShopBOSS?