JobBOSS | Ideas

Do not Allow Routing Steps to be Ran out of Sequence

We define the flow of a job on the routing.  Occasionally, a routing line gets skipped as nobody does the work and nobody claims time or parts on that line.  There is nothing that prevents us from shipping that job although a step has been skipped.  Can you please add an option for the next operation not to be able to start unless the previous operation has been completed?

  • Guest
  • Jan 17 2020
  • Future Consideration
  • Attach files
      Drop here to upload
    • Jackie Chitester commented
      December 02, 2024 20:21

      This is something we would find beneficial as well. Please consider implementing this in a build soon!