Our company utilizes standard costs on our PO's and that isn't going to be changing anytime soon. Maintaining standard costs in the Sys Admin->Material->Each Individual Material ID is very time consuming under this current method.
It would be fantastic if there were an option when generating a PO, or revising a PO, that allowed Standard Costs to be updated at that time. Another option would be a screen similar to the Location Adjustments screen where a selection of parts could be displayed with the existing Standard Cost was listed and updating the Standard Cost was allowed in a secondary column.