Import to any job that exists without PN, routings or materials even if its a level 1 or higher
We want to be able to import a BOM for a level OTHER than the 0. The jobs exists as a level 2 for example and I want to be able to import my BOM directly to the level 2. See Support Request 69.650.468
This is also a major issue for us. We build large custom equipment and import bills of materials that are hundreds to thousands of lines every day. They are always imported to a child (level 1) job as that is how we keep our projects together for scheduling, material linking, and costing.
Agreed. This has been a consistent issue as we have multi level BOM structures that contain hundreds to thousands of different parts. Also it eliminates having to import into a template or "trusting" the auto number sequencing...
This is also a major issue for us. We build large custom equipment and import bills of materials that are hundreds to thousands of lines every day. They are always imported to a child (level 1) job as that is how we keep our projects together for scheduling, material linking, and costing.
Agreed. This has been a consistent issue as we have multi level BOM structures that contain hundreds to thousands of different parts. Also it eliminates having to import into a template or "trusting" the auto number sequencing...